Group QY
| Group Description |
Transient stabilty constrained interior pt. optimal power flow, J. Quanyuan
Two problem sets from Dr. Jiang Quanyuan from Zhejiang University,
Hangzhou, China, March, 2008, used in an electrical power system.
Each matrix A is solved sequentially with two right-hand-sides, b1 and
b2, one at a time. In the UF collection, the sequence of all first
and second right-hand-sides is in Problem.aux.b2 and Problem.aux.b1.
These matrices are symmetric indefinite (x=A\b uses MA57).
Note that the last matrices in the sequence are ill-conditioned.
Transient Stability Constrained Interior Point Optimal Power Flow Program
Version 1.0 -- Developed by Dr. Jiang Quanyuan, March 2008
case9.m - TSOPF converges after 12 iterations
object = 3.945939E+03
max_equ = 3.287326E-11
low_inequ = None
up_inequ = None
case39.m - TSOPF converges after 13 iterations
object = 2.696268E+04
max_equ = 5.684342E-14
low_inequ = -1.110223E-16
up_inequ = None
|
|---|
Displaying all 2 collection matrices
| Id | Name | Group | Rows | Cols | Nonzeros | Kind | Date | Download File |
|---|---|---|---|---|---|---|---|---|
| 2136 | case39 | QY | 40,216 | 40,216 | 1,042,160 | Power Network Problem Sequence | 2008 | MATLAB Rutherford Boeing Matrix Market |
| 2214 | case9 | QY | 14,454 | 14,454 | 147,972 | Power Network Problem Sequence | 2008 | MATLAB Rutherford Boeing Matrix Market |